Quantum DLT 2500 Manual de Serviço Página 54

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 114
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 53
38
Chapter 3: Installing the Desktop DLT2000XT Tape Drive
Using the Power-On Self Test
The power-on self test starts automatically on power-on. Observe the LEDs on the front
panel, making sure that they light in the following order:
1. All LEDs on the right front panel light sequentially from top to bottom as the POST
begins. The LEDs remain on for a few seconds.
2. All LEDs on the left front panel light simultaneously for about three seconds, and
then turn off.
3. The green Operate Handle, the orange Write Protected, and the yellow Use
Cleaning Tape LEDs turn off. The yellow Tape in Use LED blinks as the tape drive
initializes.
4. After initialization, if no tape cartridge is loaded, the yellow Tape in Use LED turns
off, the green Operate Handle LED turns on, the handle unlatches, and the beeper
sounds.
Figure 3-6 shows the LEDs on the front panel.
Figure 3-6 DLT2000XT Desktop Front Panel
The power-on self test takes about 15 seconds. However, the media might require more
time to become ready for use.
Write Protected LED
Tape in Use LED
Operation Handle LED
Unload button
Tape load door
Load/unload handle
Use Cleaning Tape LED
Vista de página 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 ... 113 114

Comentários a estes Manuais

Sem comentários