Chapter 2 Installing the L500 Series Library
Running the Power-On-Self-Test (POST)
24 Quantum|ATL PowerStor L500 Series Tape Library User’s Guide
Running the Power-On-Self-Test (POST)
2
To verify proper system installation:
1
Turn on the tape library. The POST begins automatically.
Table 1
lists the tests that are run during POST, and displays the
pass or fail messages associated with these tests.
Table 1 POST Pass/
Error Messages
Next, the drives and the library are initialized. The OCP
displays:
Library Idle
Library Init
Library Idle
The OCP buttons are not active until the OCP displays
Library Idle
.
If all the POST tests complete successfully and the drives and
library are initialized, the library is ready for operation.
2
If the tests do not complete, run the POST again. Turn the
power off, wait 10 seconds, then turn the power back on. If the
tests still do not complete, the library needs service.
POST Test - Description Pass Message Error Message
ROM EDC - Flash ROM EDC
test
DLTstor POST
1 EDC
POST Error
in ROM EDC
Micro RAM - Microprocessor
Local RAM test
DLTstor POST
2 Micro RAM
POST Error
in Micro RAM
UART - QUART test
DLTstor POST
3 UART
POST Error
in UART
Other
DLTstor POST
4 Other
POST Error
in Other