Quantum P2000 Guia do Utilizador Página 113

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 146
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 112
Appendix B Relocating the Library
Preparing the Library for Operation
ATL P2000 Series Automated Tape Library Users Guide 93
Preparing the Library for Operation
2
After shipping or moving the library, refer to the ATL P2000/
P3000/P6000 Pre-Installation Site Survey Instructions and the ATL
P3000 Series Unpacking Instructions to:
Prepare the new installation site
Receive the library
Uncrate the library (required in shipping the library)
Position the library
Prepare the library for operation
Vista de página 112
1 2 ... 108 109 110 111 112 113 114 115 116 117 118 ... 145 146

Comentários a estes Manuais

Sem comentários